Heavy metal | Reference year |
Cadmium (Cd) | 1990; or an alternative year from 1985 to 1995 inclusive, specified by a Party upon ratification, acceptance, approval or accession. |
Lead (Pb) | 1990; or an alternative year from 1985 to 1995 inclusive, specified by a Party upon ratification, acceptance, approval or accession. |
Mercury (Hg) | 1990; or an alternative year from 1985 to 1995 inclusive, specified by a Party upon ratification, acceptance, approval or accession. |
Category | Description of the category |
1 | Combustion installations with a net rated thermal input exceeding 50 MW |
2 | Metal ore (including sulphide ore) or concentrate roasting or sintering installations with a capacity exceeding 150 tonnes of sinter per day for ferrous ore or concentrate, and 30 tonnes of sinter per day for the roasting of copper, lead or zinc, or any gold and mercury ore treatment. |
3 | Installations for the production of pig-iron or steel (primary or secondary fusion, including electric arc furnaces) including continuous casting, with a capacity exceeding 2.5 tonnes per hour. |
4 | Ferrous metal foundries with a production capacity exceeding 20 tonnes per day. |
5 | Installations for the production of copper, lead and zinc from ore, concentrates or secondary raw materials by metallurgical processes with a capacity exceeding 30 tonnes of metal per day for primary installations and 15 tonnes of metal per day for secondary installations, or for any primary production of mercury. |
6 | Installations for the smelting (refining, foundry casting, etc.), including the alloying, of copper, lead and zinc, including recovered products, with a melting capacity exceeding 4 tonnes per day for lead or 20 tonnes per day for copper and zinc. |
7 | Installations for the production of cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other furnaces with a production capacity exceeding 50 tonnes per day. |
8 | Installations for the manufacture of glass using lead in the process with a melting capacity exceeding 20 tonnes per day. |
9 | Installations for chlor-alkali production by electrolysis using the mercury cell process. |
10 | Installations for the incineration of hazardous or medical waste with a capacity exceeding 1 tonne per hour, or for the co-incineration of hazardous or medical waste specified in accordance with national legislation. |
11 | Installations for the incineration of municipal waste with a capacity exceeding 3 tonnes per hour, or for the co-incineration of municipal waste specified in accordance with national legislation. |