Aller au contenu principal

This content is exclusively provided by FAO / FAOLEX / ECOLEX

The present Ordinance implements the Energy Industry Act of 7 July 2005 (BGBl. I p. 1970). In particular, the Ordinance lays down provisions relating to general conditions for net connection and its use for electricity supply in low pressure. Article 1 establishes that network operators have to accept everybody to be connected to their electricity supply system. The text consists of 29 articles divided into 5 Parts as follows: General provisions (1); Network connection (2); Use of connection (3); General provisions (4); Final provisions (5).
The present Ordinance implements the Energy Industry Act of 7 July 2005 (BGBl. I p. 1970). In particular, the Ordinance lays down provisions relating to general conditions for net connection and its use for electricity supply in low pressure. Article 1 establishes that network operators have to accept everybody to be connected to their electricity supply system. The text consists of 29 articles divided into 5 Parts as follows: General provisions (1); Network connection (2); Use of connection (3)
Titre:
Low Voltage Connection Ordinance.
Pays:
Allemagne
Type of document:
Règlement
Données de base:
Fichiers:
Date of text:
Abrogé:
Non
Amends
Amended by
Implements